Hinkley Point C receives key turbine generator

November

18

0 comments

  

 [[{“value”:”

Hinkley Point C has marked a key milestone as the 12m long, 450-tonne turbine generator stator arrives at the Somerset construction site.

This stator, the largest ever built by Arabelle Solutions, will help generate enough low carbon electricity to power three million homes.

Delivered safely via road, rail, and sea, it has completed its journey from Belfort, France, on 17th November.

The post Hinkley Point C receives key turbine generator appeared first on Energy Live News.

The post Hinkley Point C receives key turbine generator appeared first on Energy News Beat.

“}]] 

About the author,

Leave a Reply

Your email address will not be published. Required fields are marked

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}